|
SENG
629
Software Engineering
Standards and Models

¤ SENG
629 (Winter, 2001/02/.../2009) - Software Engineering Standards and Models
Type:
Q(3-0)
Lecturer:
Dr. Y. Wang
Period:
Feb. 24 - March 31, 2010
Date:
Wednesdays
Time:
17:30 – 20:30
Classroom:
ICT 516
Course
description:
Empirical
software engineering: Roles,
Processes, Best practices, Experience repository, Benchmarks,
Standardization. Formal
description and algorithms of current software engineering
standards and models: The capability maturity model
(CMM), The ISO software quality system model (ISO 9001), The
European software process model (BOOTSTRAP), The ISO software
life-cycle process assessment standard (ISO 15504), and The
unified software engineering process reference model (SEPRM).
Case
studies. Trends and future development in software engineering
standardization.
Evaluation:
1.
Assignments (x6): 60%
-
Hand in on
Tuesdays following each lecture
-
Grade is based on
quality, correctness, depth of analysis, and timeliness
-
Electronic submission in Word format is required
2.
Final case-study report: 40%
-
> 10 pages
- Grades are based on
originality, data quality,
depth of analysis,
summary of knowledge gained in
this course.
Reference
textbooks:
Y. Wang and G. King
(2000), Software Engineering Processes: Principles and
Applications, CRC Press, ISBN:
0-8493-2366-5.
J.
Moore (1998), Software Engineering Standards: A User's Road
Map, IEEE Computer Society; ISBN: 0-8186-8008-3.

|
THE
SEPRM
PROCESS ASSESSMENT FORM
|
|
SEPRM
PROCESS ASSESSMENT TEMPLATES
|
ID#:
Date:
---------------------------------------------
-------------------------------------
|
No.
|
Subject
|
Remarks
|
|
1
|
Organization to be assessed
|
Specify name of organization
|
|
|
|
|
|
|
|
|
|
2
|
Department to be assessed
|
Specify unit of organization
|
|
|
|
|
|
|
|
|
|
3
|
Project(s) to be assessed
|
Specify project name(s)
|
|
|
|
|
|
|
|
|
|
4
|
Sponsor of the assessment
|
Identify sponsor of the assessment
|
|
|
|
|
|
|
|
|
|
5
|
Aims of assessment
|
Specify aims of assessment
|
|
5.1
|
Process establishment
|
|
|
5.2
|
Process capability assessment
|
|
|
5.3
|
Process improvement
|
|
|
5.4
|
Other (to be specified)
|
|
|
|
|
|
|
6
|
Assessment classification
|
Specify type of assessment
|
|
6.1
|
Conformance of assessment to a certain
model/standard
|
|
|
6.2
|
Independent (third-party) assessment
|
|
|
6.3
|
Second-party assessment
|
|
|
6.4
|
Self-assessment
|
|
|
6.5
|
Couched self-assessment
|
|
|
6.6
|
Other (to be specified)
|
|
|
|
|
|
|
7
|
Provisional date for assessment
|
Describe provisional date for the assessment
|
|
|
|
|
|
|
|
|
|
8
|
Special need(s) for assessment
|
Specify any special needs for the
assessment
|
|
|
|
|
|
|
|
|
|
|
|
|
ID#:
Date:
---------------------------------------------
-------------------------------------
|
No.
|
Subject
|
Remarks
|
|
1
|
Project to be assessed
|
|
|
|
|
|
|
|
|
|
|
2
|
Processes to be assessed in
SEPRM
|
Specify processes to be
assessed
|
|
2.1
|
Organization process
subsystem
|
|
|
2.1.1
|
Organization
structure process category
|
|
|
2.1.1.1
|
Organization
definition
|
|
|
2.1.1.2
|
Project
organization
|
|
|
2.1.2
|
Organizational
process category
|
|
|
2.1.2.1
|
Organization
process definition
|
|
|
2.1.2.2
|
Organization
process improvement
|
|
|
2.1.3
|
Customer
service process category
|
|
|
2.1.3.1
|
Customer
relations
|
|
|
2.1.3.2
|
Customer
support
|
|
|
2.1.3.3
|
Software/system
delivery
|
|
|
2.1.3.4
|
Service
evaluation
|
|
|
2.2
|
Development process
subsystem
|
|
|
2.2.1
|
Software
engineering methodology process category
|
|
|
2.2.1.1
|
Software
engineering modeling
|
|
|
2.2.1.2
|
Reuse
methodologies
|
|
|
2.2.1.3
|
Technology
innovation
|
|
|
2.2.2
|
Software
development process category
|
|
|
2.2.2.1
|
Development
process definition
|
|
|
2.2.2.2
|
Requirement
analysis
|
|
|
2.2.2.3
|
Design
|
|
|
2.2.2.4
|
Coding
|
|
|
2.2.2.5
|
Module
testing
|
|
|
2.2.2.6
|
Integration
and system testing
|
|
|
2.2.2.7
|
Maintenance
|
|
|
2.2.3
|
Software
development environment process category
|
|
|
2.2.3.1
|
Environment
|
|
|
2.2.3.2
|
Facilities
|
|
|
2.2.3.3
|
Development
support tools
|
|
|
2.2.3.4
|
Management
support tools
|
|
|
2.3
|
Management process subsystem
|
|
|
2.3.1
|
Software
quality assurance (SQA) process category
|
|
|
2.3.1.1
|
SQA
process definition
|
|
|
2.3.1.2
|
Requirement
review
|
|
|
2.3.1.3
|
Design
review
|
|
|
2.3.1.4
|
Code
review
|
|
|
2.3.1.5
|
Module
testing audit
|
|
|
2.3.1.6
|
Integration
and system testing audit
|
|
|
2.3.1.7
|
Maintenance
audit
|
|
|
2.3.1.8
|
Audit
and inspection
|
|
|
2.3.1.9
|
Peer
review
|
|
|
2.3.1.10
|
Defect
control
|
|
|
2.3.1.11
|
Subcontractor’s
quality control
|
|
|
2.3.2
|
Project
planning process category
|
|
|
2.3.2.1
|
Project
plan
|
|
|
2.3.2.2
|
Project
estimation
|
|
|
2.3.2.3
|
Project
risk avoidance
|
|
|
2.3.2.4
|
Project
quality plan
|
|
|
2.3.3
|
Project
management process category
|
|
|
2.3.3.1
|
Process
management
|
|
|
2.3.3.2
|
Process
tracking
|
|
|
2.3.3.3
|
Configuration
management
|
|
|
2.3.3.4
|
Change
control
|
|
|
2.3.3.5
|
Process
review
|
|
|
2.3.3.6
|
Intergroup
coordination
|
|
|
2.3.4
|
Contract
and requirement management process category
|
|
|
2.3.4.1
|
Requirement
management
|
|
|
2.3.4.2
|
Contract
management
|
|
|
2.3.4.3
|
Subcontractor
management
|
|
|
2.3.4.4
|
Purchasing
management
|
|
|
2.3.5
|
Document
management process category
|
|
|
2.3.5.1
|
Documentation
|
|
|
2.3.5.2
|
Process
database/library
|
|
|
2.3.6
|
Human
resource management process category
|
|
|
2.3.6.1
|
Staff
selection and allocation
|
|
|
2.3.6.2
|
Training
|
|
|
3
|
Constraints of assessment
|
For instance, resources,
budget, and critical milestones
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
4
|
Assessment output
requirements
|
Tick and describe additional
output of assessment
|
|
4.1
|
Project
process capability level
|
|
|
4.2
|
Process
capability profile
|
|
|
4.3
|
Process
strengths and weaknesses analysis report
|
|
|
4.4
|
Potential
process improvement opportunities
|
|
|
4.5
|
Executive
summary of assessment results
|
|
|
|
|
|
|
5
|
Background factors which may
affect performance
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Template
E.3 Assessment
Team and Responsibilities
ID#:
Date:
---------------------------------------------
------------------------------------
|
No.
|
Role [Name]
|
Responsibility
|
|
1
|
Sponsor
|
|
|
|
|
- prepare assessment agreement
- select unit representative(s)
- organize assessment supporting activities
- review assessment report
- report to higher management
|
|
2
|
Lead Assessor
|
|
|
|
|
- prepare assessment agreement with sponsor
- select assessor(s) with sponsor
- develop assessment brief
- organize assessment activities
- review assessment report
- present assessment report
|
|
3
|
Assessors
|
|
|
3.1
|
Assessor 1
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
4
|
Others
|
|
|
4.1
|
Project Management Representative
|
|
|
|
|
|
|
|
|
|
|
4.2
|
Project Technical Representative
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Table
E.4 Assessment
Confidentiality Agreement
Assessment
Confidentiality Agreement
ID#:
Date:
1. Scope and purpose of
this document
This document has been agreed to provide mutual
confidentiality to all parties involved in the
assessment to be conducted at Organization X during
<DD1/MM1/YY1> to <DD2/MM2/YY2>.
2. Parties to the
agreement
The parties in this agreement will be
Organization X (herein referred to as “Party A”) and
Organization Y (herein referred to as “Party B”).
3. Confidentiality
Throughout the course of the assessment, and all
times thereafter, the parties are hereby bound to
observe complete confidentiality as to all matters
concerning the affairs of each other; and all details
relating to the assessment, now and in the future. None
of the parties (including any associated companies or
subsidiaries) will disclose information regarding the
outcome of the assessment or engage in publicity
pertaining to the other party without prior agreement
from the other party.
All parties hereby confirm their acceptance.
Signed
for and on behalf of Party A
Signed for and on behalf of Party B
Signature
……………………… Signature
………...……….…….
Full
name
Full
name
(print)
…………………….……
(print)
…………………………..
Position
Project manager
Position
Lead assessor
Address ……………………….
Address
………….………..…...
………………….……
…………..……………
……………………….
………………..………
Date
Date
Place
………………..………
Place …………..……………
|
Table
E.5 Assessment
Schedule and Resources
ID#:
Date:
---------------------------------------------
---------------------------------------
|
No.
|
Subject
|
Responsibility
|
Resource
|
Planed
date
|
Completed date
|
|
1
|
Initiation of an assessment
|
Lead
assessor/sponsor
|
|
|
|
|
2
|
Sponsor commitment
|
Sponsor
|
|
|
|
|
3
|
Define assessment purpose
|
Lead
assessor/sponsor
|
|
|
|
|
4
|
Define assessment scope
|
Lead
assessor/sponsor
|
|
|
|
|
5
|
Sponsor approval of
assessment input
|
Lead
assessor/sponsor
|
|
|
|
|
6
|
Appoint assessment team
|
Lead
assessor/sponsor
|
|
|
|
|
7
|
Prepare assessment
confidentiality agreement
|
Lead
assessor/sponsor
|
|
|
|
|
8
|
Plan schedule and
resources
|
Lead
assessor/sponsor
|
|
|
|
|
9
|
Determine assessment
reference model,
assessment model, and tool
|
Assessors
|
|
|
|
|
10
|
Map customer’s
processes to SEPRM model
|
Assessors
|
|
|
|
|
11
|
Define processes to be
assessed and target
capability levels
|
Assessors/
Sponsor
|
|
|
|
|
12
|
Develop assessment brief
|
Lead
assessor
|
|
|
|
|
13
|
Organizational unit briefing
|
Lead
assessor/ sponsor
|
|
|
|
|
14
|
Data collection
|
Assessors/
Assessees
|
|
|
|
|
15
|
Data validation
|
Assessors/
Assessees
|
|
|
|
|
16
|
Capability rating and
analysis
|
Assessors/
Assessees
|
|
|
|
|
17
|
Briefing initial assessment results
|
Assessors/
sponsor/
assessees
|
|
|
|
|
18
|
Process strengths and
weaknesses analysis
|
Assessors
|
|
|
|
|
19
|
Process improvement
opportunity analysis
|
Assessors
|
|
|
|
|
20
|
Develop assessment report
|
Lead
assessor/ sponsor
|
|
|
|
|
21
|
Review and presentation of assessment report
|
Lead
assessor/ sponsor/
assessees
|
|
|
|
|
22
|
Action plan for process
improvement
|
Sponsor/
competent
assessor/
assessees
|
|
|
|
|
23
|
Other (to be specified)
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Table
E.6 Processes to
be Assessed and Target Capability Levels
ID#:
Date:
---------------------------------------------
---------------------------------------
|
No.
|
Process
|
Selection in
Assessment
|
Target
Capability
Level
|
Corresponding
Processes
on Site
|
|
1
|
Organization
subsystem
|
|
|
|
|
1.1
|
Organization
structure category
|
|
|
|
|
1.1.1
|
Organization
definition
|
|
|
|
|
1.1.2
|
Project organization
|
|
|
|
|
1.2
|
Organization
process category
|
|
|
|
|
1.2.1
|
Organization process definition
|
|
|
|
|
1.2.2
|
Organization process improvement
|
|
|
|
|
1.3
|
Customer
service category
|
|
|
|
|
1.3.1
|
Customer relations
|
|
|
|
|
1.3.2
|
Customer support
|
|
|
|
|
1.3.3
|
Software/system delivery
|
|
|
|
|
1.3.4
|
Service evaluation
|
|
|
|
|
2
|
Development
|
|
|
|
|
2.1
|
Software
engineering methodology category
|
|
|
|
|
2.1.1
|
Software engineering modeling
|
|
|
|
|
2.1.2
|
Reuse methodologies
|
|
|
|
|
2.1.3
|
Technology innovation
|
|
|
|
|
2.2
|
Software
development category
|
|
|
|
|
2.2.1
|
Development process definition
|
|
|
|
|
2.2.2
|
Requirement analysis
|
|
|
|
|
2.2.3
|
Design
|
|
|
|
|
2.2.4
|
Coding
|
|
|
|
|
2.2.5
|
Module testing
|
|
|
|
|
2.2.6
|
Integration and system testing
|
|
|
|
|
2.2.7
|
Maintenance
|
|
|
|
|
2.3
|
Software
development environment category
|
|
|
|
|
2.3.1
|
Environment
|
|
|
|
|
2.3.2
|
Facilities
|
|
|
|
|
2.3.3
|
Development support
tools
|
|
|
|
|
2.3.4
|
Management support
tools
|
|
|
|
|
3
|
Management
|
|
|
|
|
3.1
|
Software
quality assurance category
|
|
|
|
|
3.1.1
|
SQA process definition
|
|
|
|
|
3.1.2
|
Requirement review
|
|
|
|
|
3.1.3
|
Design review
|
|
|
|
|
3.1.4
|
Code review
|
|
|
|
|
3.1.5
|
Module testing audit
|
|
|
|
|
3.1.6
|
Integration and system testing audit
|
|
|
|
|
3.1.7
|
Maintenance audit
|
|
|
|
|
3.1.8
|
Audit and inspection
|
|
|
|
|
3.1.9
|
Peer review
|
|
|
|
|
3.1.10
|
Defect control
|
|
|
|
|
3.1.11
|
Subcontractor’s quality control
|
|
|
|
|
3.2
|
Project
planning category
|
|
|
|
|
3.2.1
|
Project plan
|
|
|
|
|
3.2.2
|
Project estimation
|
|
|
|
|
3.2.3
|
Project risk avoidance
|
|
|
|
|
3.2.4
|
Project quality plan
|
|
|
|
|
3.3
|
Project
management category
|
|
|
|
|
3.3.1
|
Process management
|
|
|
|
|
3.3.2
|
Process tracking
|
|
|
|
|
3.3.3
|
Configuration management
|
|
|
|
|
3.3.4
|
Change control
|
|
|
|
|
3.3.5
|
Process review
|
|
|
|
|
3.3.6
|
Intergroup coordination
|
|
|
|
|
3.4
|
Contract
and requirement management category
|
|
|
|
|
3.4.1
|
Requirement management
|
|
|
|
|
3.4.2
|
Contract management
|
|
|
|
|
3.4.3
|
Subcontractor management
|
|
|
|
|
3.4.4
|
Purchasing management
|
|
|
|
|
3.5
|
Document
management category
|
|
|
|
|
3.5.1
|
Documentation
|
|
|
|
|
3.5.2
|
Process database/library
|
|
|
|
|
3.6
|
Human
resource management category
|
|
|
|
|
3.6.1
|
Staff selection and allocation
|
|
|
|
|
3.6.2
|
Training
|
|
|
|
Table
E.7 Assessment
Brief
ID#:
Date:
---------------------------------------------
---------------------------------------
|
No.
|
Item
|
Remark
|
|
1
|
Organization
|
Refer to Template E.1
|
|
|
|
|
|
|
|
|
|
2
|
Department to be assessed
|
Refer to Template E.1
|
|
|
|
|
|
|
|
|
|
3
|
Project(s)
|
Refer to Template E.1
|
|
|
|
|
|
|
|
|
|
4
|
Sponsor
|
Refer to Template E.1
|
|
|
|
|
|
|
|
|
|
5
|
Purpose of assessment
|
Refer to Template E.1
|
|
|
|
|
|
|
|
|
|
|
|
|
|
6
|
Scope of assessment
|
Refer to Template E.2
|
|
|
|
|
|
|
|
|
|
|
|
|
|
7
|
Constraints of assessment
|
Refer to Template E.2
|
|
|
|
|
|
|
|
|
|
|
|
|
|
8
|
Assessment team
|
Refer to Template E.3
|
|
|
|
|
|
|
|
|
|
|
|
|
|
9
|
Resources needed
|
Estimate amount of effort required and type of
resources
|
|
|
|
|
|
|
|
|
|
|
|
|
|
10
|
Key milestones
|
Refer to Template E.5
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
11
|
Summary of process to be assessed and target
capability level(s)
|
Refer to Template E.6
|
|
|
|
|
|
|
|
|
|
|
|
|
|
12
|
Assessment approach
|
Describe method and approach adopted for the
assessment
|
|
|
|
|
|
|
|
|
|
|
|
|
|
13
|
Other
|
To be specified by assessors
|
|
|
|
|
|
|
|
|
|
|
|
|
Table
E.8 Process
Strengths and Weaknesses Analysis
ID#:
Date:
---------------------------------------------
---------------------------------------
|
No.
|
Process
|
Assessed
Level
[AL]
|
Targeted
Level
[TL]
|
Strengths(+)/
Weaknesses (-)
[AL-TL]
|
|
1
|
Organization
|
|
|
|
|
1.1
|
Organization
structure category
|
|
|
|
|
1.1.1
|
Organization
definition
|
|
|
|
|
1.1.2
|
Project organization
|
|
|
|
|
1.2
|
Organization
process category
|
|
|
|
|
1.2.1
|
Organization process definition
|
|
|
|
|
1.2.2
|
Organization process improvement
|
|
|
|
|
1.3
|
Customer
service category
|
|
|
|
|
1.3.1
|
Customer relations
|
|
|
|
|
1.3.2
|
Customer support
|
|
|
|
|
1.3.3
|
Software and system delivery
|
|
|
|
|
1.3.4
|
Service evaluation
|
|
|
|
|
2
|
Development
|
|
|
|
|
2.1
|
Software engineering methodology category
|
|
|
|
|
2.1.1
|
Software engineering modeling
|
|
|
|
|
2.1.2
|
Reuse methodologies
|
|
|
|
|
2.1.3
|
Technology innovation
|
|
|
|
|
2.2
|
Software
development category
|
|
|
|
|
2.2.1
|
Development process definition
|
|
|
|
|
2.2.2
|
Requirement analysis
|
|
|
|
|
2.2.3
|
Design
|
|
|
|
|
2.2.4
|
Coding
|
|
|
|
|
2.2.5
|
Module testing
|
|
|
|
|
2.2.6
|
Integration and system testing
|
|
|
|
|
2.2.7
|
Maintenance
|
|
|
|
|
2.3
|
Software
development environment
category
|
|
|
|
|
2.3.1
|
Environment
|
|
|
|
|
2.3.2
|
Facilities
|
|
|
|
|
2.3.3
|
Development support
tools
|
|
|
|
|
2.3.4
|
Management support
tools
|
|
|
|
|
3
|
Management
|
|
|
|
|
3.1
|
Software
quality assurance category
|
|
|
|
|
3.1.1
|
SQA process definition
|
|
|
|
|
3.1.2
|
Requirement review
|
|
|
|
|
3.1.3
|
Design review
|
|
|
|
|
3.1.4
|
Code review
|
|
|
|
|
3.1.5
|
Module testing audit
|
|
|
|
|
3.1.6
|
Integration and system testing audit
|
|
|
|
|
3.1.7
|
Maintenance audit
|
|
|
|
|
3.1.8
|
Audit and inspection
|
|
|
|
|
3.1.9
|
Peer review
|
|
|
|
|
3.1.10
|
Defect control
|
|
|
|
|
3.1.11
|
Subcontractor’s quality control
|
|
|
|
|
3.2
|
Project
planning category
|
|
|
|
|
3.2.1
|
Project plan
|
|
|
|
|
3.2.2
|
Project estimation
|
|
|
|
|
3.2.3
|
Project risk avoidance
|
|
|
|
|
3.2.4
|
Project quality plan
|
|
|
|
|
3.3
|
Project
management category
|
|
|
|
|
3.3.1
|
Process management
|
|
|
|
|
3.3.2
|
Process tracking
|
|
|
|
|
3.3.3
|
Configuration management
|
|
|
|
|
3.3.4
|
Change control
|
|
|
|
|
3.3.5
|
Process review
|
|
|
|
|
3.3.6
|
Intergroup coordination
|
|
|
|
|
3.4
|
Contract
and requirement management
category
|
|
|
|
|
3.4.1
|
Requirement management
|
|
|
|
|
3.4.2
|
Contract management
|
|
|
|
|
3.4.3
|
Subcontractor management
|
|
|
|
|
3.4.4
|
Purchasing management
|
|
|
|
|
3.5
|
Document
management category
|
|
|
|
|
3.5.1
|
Documentation
|
|
|
|
|
3.5.2
|
Process database/library
|
|
|
|
|
3.6
|
Human
resource management category
|
|
|
|
|
3.6.1
|
Staff selection and allocation
|
|
|
|
|
3.6.2
|
Training
|
|
|
|
Table
E.9 Process
Improvement Opportunities Analysis
ID#:
Date:
---------------------------------------------
---------------------------------------
|
No.
|
Process
|
Strengths(+)/
Weaknesses (-)
[AL-TL]
|
Improvement
Priority
(IP)
|
Remarks
and
Risks
|
|
1
|
Organization
|
|
|
|
|
1.1
|
Organization
structure category
|
|
|
|
|
1.1.1
|
Organization
definition
|
|
|
|
|
1.1.2
|
Project organization
|
|
|
|
|
1.2
|
Organization
process category
|
|
|
|
|
1.2.1
|
Organization process definition
|
|
|
|
|
1.2.2
|
Organization process improvement
|
|
|
|
|
1.3
|
Customer
service category
|
|
|
|
|
1.3.1
|
Customer relations
|
|
|
|
|
1.3.2
|
Customer support
|
|
|
|
|
1.3.3
|
Software and system delivery
|
|
|
|
|
1.3.4
|
Service evaluation
|
|
|
|
|
2
|
Development
|
|
|
|
|
2.1
|
Software engineering methodology
category
|
|
|
|
|
2.1.1
|
Software engineering modeling
|
|
|
|
|
2.1.2
|
Reuse methodologies
|
|
|
|
|
2.1.3
|
Technology innovation
|
|
|
|
|
2.2
|
Software
development category
|
|
|
|
|
2.2.1
|
Development process definition
|
|
|
|
|
2.2.2
|
Requirement analysis
|
|
|
|
|
2.2.3
|
Design
|
|
|
|
|
2.2.4
|
Coding
|
|
|
|
|
2.2.5
|
Module testing
|
|
|
|
|
2.2.6
|
Integration and system testing
|
|
|
|
|
2.2.7
|
Maintenance
|
|
|
|
|
2.3
|
Software
engineering infrastructure
category
|
|
|
|
|
2.3.1
|
Environment
|
|
|
|
|
2.3.2
|
Facilities
|
|
|
|
|
2.3.3
|
Development support
tools
|
|
|
|
|
2.3.4
|
Management support
tools
|
|
|
|
|
3
|
Management
|
|
|
|
|
3.1
|
Software
quality assurance category
|
|
|
|
|
3.1.1
|
SQA process definition
|
|
|
|
|
3.1.2
|
Requirement review
|
|
|
|
|
3.1.3
|
Design review
|
|
|
|
|
3.1.4
|
Code review
|
|
|
|
|
3.1.5
|
Module testing audit
|
|
|
|
|
3.1.6
|
Integration and system testing audit
|
|
|
|
|
3.1.7
|
Maintenance audit
|
|
|
|
|
3.1.8
|
Audit and inspection
|
|
|
|
|
3.1.9
|
Peer review
|
|
|
|
|
3.1.10
|
Defect control
|
|
|
|
|
3.1.11
|
Subcontractor’s quality control
|
|
|
|
|
3.2
|
Project
planning category
|
|
|
|
|
3.2.1
|
Project plan
|
|
|
|
|
3.2.2
|
Project estimation
|
|
|
|
|
3.2.3
|
Project risk avoidance
|
|
|
|
|
3.2.4
|
Project quality plan
|
|
|
|
|
3.3
|
Project
management category
|
|
|
|
|
3.3.1
|
Process management
|
|
|
|
|
3.3.2
|
Process tracking
|
|
|
|
|
3.3.3
|
Configuration management
|
|
|
|
|
3.3.4
|
Change control
|
|
|
|
|
3.3.5
|
Process review
|
|
|
|
|
3.3.6
|
Intergroup coordination
|
|
|
|
|
3.4
|
Contract
and requirement management
category
|
|
|
|
|
3.4.1
|
Requirement management
|
|
|
|
|
3.4.2
|
Contract management
|
|
|
|
|
3.4.3
|
Subcontractor management
|
|
|
|
|
3.4.4
|
Purchasing management
|
|
|
|
|
3.5
|
Document
management category
|
|
|
|
|
3.5.1
|
Documentation
|
|
|
|
|
3.5.2
|
Process database/library
|
|
|
|
|
3.6
|
Human
resource management category
|
|
|
|
|
3.6.1
|
Staff selection and allocation
|
|
|
|
|
3.6.2
|
Training
|
|
|
|
|